Uncle Jeff's drawings.
Before (6/12/11). |
See the newspaper patch job the |
Starting to rewire (7/11/11).
Drywall. (7/20/11). |
Primed. (7/28/11). |
Painted. (7/29/11). |
Upper cabinets (8/1/11). |
Lower cabinets (8/2/11). |
Crown molding (8/4/11). |
Granite (8/16/11). |
Tile backsplash(9/1/11). |
New floor (9/2/11).
Before (6/12/11). |
After. Look at all the wires (6/15/11). |
New wiring and plumbing (7/11/11).
Drywall (7/20/11). |
Taped (7/25/11). |
Primed (7/28/11). |
Painted (7/29/11). |
Before (6/12/11). |
After. Temporary entry for |
Taped (7/25/11). |
Primed (7/28/11). |
Painted (7/29/11). |
Lower pantry cabinets (8/3/11). |
Uppers (8/25/11). |
New floor (9/2/11). |
Before (6/12/11). |
After. Upper right - another drywall |
Insulation (7/20/11 morning). |
Drywall (7/20/11 afternoon). |
Taped (7/25/11). |
Primed (7/28/11). |
Painted (7/29/11). |
Cabinets (8/1/11). |
More cabinets (8/2/11). |
Crown molding (8/4/11). |
Granite (8/16/11). |
New hood (8/25/11). |
Tile backsplash (9/2/11). |
New floor (9/2/11). |
Grout (9/6/11). |
Stove (9/7/11). |
Peninsula - before (6/12/11). |
After (6/15/11). |
Pipes for the new prep sink in the peninsula (7/11/11).
Taped (7/25/11). |
Primed (7/28/11). |
Peninsula cabinets in place (8/3/11). |
Crown molding (8/4/11). |
Plywood skin for peninsula prep |
Cold rolled steel bars to reinforce |
Electrical socket at end of peninsula (8/15/11). |
Granite (8/16/11). |
Faucet (8/25/11). |
Tile backsplash (9/1/11). |
New floor (9/2/11).
Before view of sink area (6/12/11). |
After - with window area boarded |
New pipes (6/30/11). |
New wiring (7/19/11). |
Insulation (7/20/11 morning). |
Drywall (7/20/11 afternoon). |
Taped (7/25/11). |
Primed (7/28/11). |
Painted (7/29/11). |
New cabinets (8/2/11). |
Crown molding (8/4/11). |
Plywood skin for new sink (8/9/11). |
Window casing (8/15/11). |
Granite (8/16/11). |
New floor (9/2/11). |
Dishwasher and faucet (9/7/11). |
Finally.
Old electrical panel (6/16/11). |
New electrical panel (8/16/11). |
2nd layer of stucco (8/22/11). |
Final layer of stucco (9/7/11). |
New exterior door with scratch coat (8/16/11).
2nd layer (8/22/11). |
Final layer (8/22/11). |
New window with scratch coat (8/16/11). |
2nd layer (8/22/11). |
Final layer (9/7/11).